The Bridge Contractor will be closing Thornville Road north of Dryden Road for bridge deck work over the South Branch of the Flint River.  There are two (2) bridges that cross the South Branch of the Flint River immediately north of Dryden Road.  Contractor will stage bridge work to not land lock resident between the bridges.  Initially they will close the first bridge north of Dryden Road.  Thornville Road south of Dryden Road also remains closed for bridge work.  Click Here to download Detour Map