2022 Dryden Road HMA Overlay Project

The Lapeer CRC received funding from the State of Michigan’s Rural Task Force to assist with the placement of an HMA Asphalt Overlay on Dryden Road.  The HMA Asphalt Overlay will be placed on Dryden Road from 1) Blood Road easterly to Rochester Road, and 2) from...

2022 Culvert Replacement Program

Each year, Road Cross Culverts are identified for replacement throughout the County of Lapeer.  These replacements are due to upcoming projects or the condition assessments of the asset.   The Lapeer CRC is legally responsible for maintaining drainage along the Right...

2022 HMA (Asphalt) Overlay Program

Each year the Lapeer CRC establishes a maintenance program for Primary Roads.  For Roads with PASER Ratings of #3 or #4, the best “bang for the buck” would be a HMA (Hot Mix Asphalt) overlay.  The goal of this maintenance selection should extend the life...

2022 Traffic Count (ADT) Collection

Average Daily Traffic (ADT) Count data is collected along Lapeer County Primary and Local Roadways on a 4-yr Rotation throughout the County.  When collecting data, air hoses are placed across the Roadway.  Vehicles cross the hose and create a puff of air which is sent...

2022 Sign Replacements

Traffic signs greater than 15 years old are scheduled to be reviewed and replaced as necessary.  This practice is per the State of Michigan Sign Reflectivity Law. Each year signs scheduled for review follow the current 5-year rotation plan.  2022 Signs are located in...

2022 Pavement Marking Program

Painting of Centerline and Edge Lines on Primary and Local Roads per the current 3-year Rotation Plan.