2022 Davison Road Bridge

Davison Road Bridge over Hasler Creek, located east of Maple Leaf Road, will be closed starting in late June until approximately late July 2022.  Actual Construction Schedule to be determined.  Work includes, but is not limited to, re-sealing bridge superstructure,...

2022 Genesee Road Bridge

Genesee Road Bridge over Hasler Creek, located east of Elba Road, will be closed starting in early May until approximately early July 2022.  Actual Construction Schedule to be determined.  Work includes, but is not limited to, removal of existing asphalt surface,...

2022 Mitchell Road Bridge

Mitchell Road Bridge over Farmers Creek, located east of Bullock Road, will be closed starting in mid- April until approximately end of June.  Actual Construction Schedule to be determined.  Work includes, but is not limited to, removal of existing asphalt surface,...

2022 Thornville Road (2) Bridges (North of Dryden Road)

Two  (2) Thornville Road Bridges over South Branch of the Flint River (Structures #5416 & #5417), located north of Dryden Road, will be closed starting in early April until approximately end of June.  Actual Construction Schedule to be determined.  Only one (1)...

2022 Thornville Road Bridge (South of Dryden Road)

Thornville Road Bridge over South Branch of the Flint River (Structure #5414), located south of Dryden Road, will be closed starting in early April until approximately end of June.  Actual Construction Schedule to be determined.  Work includes, but is not limited to,...