2022 Thornville Road Bridge (South of Dryden Road)

Thornville Road Bridge over South Branch of the Flint River (Structure #5414), located south of Dryden Road, will be closed starting March 28, 2022 until approximately end of June.  Actual Construction Schedule to be determined.  Work includes, but is not limited to, removal of existing asphalt surface, repair of the bridge superstructure, placement of new asphalt deck and approaches, and new guardrail.  Project is being funded through the State of Michigan’s Critical Bridge Program.

Funding source(s): Critical Bridge Fund

Location of roadwork:

Thornville Road, south of Dryden Road

Dryden

When is the work being done:

March 28, 2022 - Late June 2022

Description of work:

Bridge Rehabilitation

Impact on Traffic:

Bridge will be Closed to Traffic during Project

Latest Updates

March 24, 2022 Thornville Road Bridge Work to Begin

Work on three (3) Bridges on Thornville Road, Dryden Twp, will begin in early April 2022.  Estimated completion is anticipated in late June 2022.   Watch for schedule updates on the Lapeer CRC Facebook page or on the website for Project Information

Receive Updates on the Project
Subscribe to Project Updates

Project Contact

Destain Gingell, PE